skip to Main Content

ENESPA GmbH Germany

The most important reason for setting up production in Germany first is the ready availability of suitable raw material. In Germany, the “yellow bag” has been used to collect plastic waste for years. Sorting systems are correspondingly sophisticated. From this point of view, our neighbouring country is just the right location to start recycling production.

Possible price development* of the private equity share depending on production capacity.

Reasons behind the corporate structure of ENESPA AG
Cyrill Hugi is a Swiss citizen residing in Appenzell. That’s why the parent company is located there. ENESPA AG Balzers was founded because the regulatory authority FMA in Liechtenstein is a reliable partner for the control and issuance of bonds. In addition, capital gained through the bonds can be invested directly in ENESPA GmbH Germany (EU area).
The ENESPA AG technology is being intensively and continuously developed. With the establishment of ENESPA Technologies AG, these expenses can be managed separately with a high degree of transparency.

More news articles

Documents for investors

I would like to receive documentation on






For our children:
Ecological and economical
invest wisely

ENESPA AG will generate positive cash flow starting with the first investment. By operating several facilities simultaneously, revenues increase disproportionately and, accordingly, so does the value of the company. There is great demand for this technology. 18 locations in Germany are interested in operating a facility at this time.

The business development fund of the Schwarze Pumpe Industrial Park is very interested in the ENESPA project. Following a thorough investigation, the responsible development bank declared the project eligible for funding. The project will be supported by the development bank once the approval process is completed. The approval process is in progress. (As of July 2020)

The aim is for the first 5,000 kg/day facility in the industrial park to be commissionedby the end of 2020. As soon as this facility is in reliable operation, ENESPA will build another ten facilities and then gradually expand to forty facilities. The ten facilities are expected to be fully operational by the end of 2021.

Back To Top